From installing the drilling equipment to completing the water point, explore each stage of this field initiative.
Installing the water point pumpBuilding the water point shelterInstalling the basin and pumpPreparing the surrounding areaDrilling work on siteSetting up the drilling equipmentMonitoring the work with the communityTeam at work on the site